Jan 21, 2015

Stairway to... The laundry room!

Our stairs are in!!! Yay! Finally we don't have to climb up and down a ladder that barely reached the top! Totally safe :)


Our stairs were made by the same guy who's doing our kitchen and bathroom cabinetry and fire place mantel. So far, I'm really impressed!

We went with rustic hickory treads and we'll be painting the risers black. It's all unfinished now and we'll need to stain/oil and paint them ourselves. 

It's hard to see because they're all protected, but there is lots of colour variation in the wood, which I love!


You can see how giant these stairs are... He installed them by himself! That's right, just 1 guy. I was there, but I was almost afraid to watch!!


Our basement is going to be unfinished for a while, except for the laundry room, but we faked it because the staircase is open. There's drywall all the way down, and along the wall directly in front of the stairs. 


We'll put a piece of carpet down there for now and nobody will ever know! Except for anyone who reads this blog and anyone who comes over :)

The outside is progressing well too!



The drywall will be 100% done tomorrow and our flooring installer is starting the tile work at the end of the week.
Jake and his Dad worked hard all day today to get our floors ready for tile. 


Our trim is being delivered on Friday so we can start painting it. Doors will be delivered the following Friday and we'll hopefully start painting early next week!!  
I can't believe we're painting already! Woohoo! The end is in sight!

Jan 18, 2015

Stress and Siding... Not related.

What should I start with? Stress? Might as well... Because it will likely be throughout this post anyway!

Things are starting to get really stressful as we near the end. If I thought it was stressful before, I had no idea what I was heading into! 

Our drywall is all hung and the taper worked all weekend and is almost finished as well. The house is really starting to look good! (Trying to maintain a positive attitude :) )

When we decided to build this house ourselves, we never really thought about all the little things we'd actually end up doing BY ourselves.  When it came time to hanging drywall, there were all these little spots that needed blocking and strapping so they had something to actually attach the drywall to. Our framer had done a pretty good job of getting most spots, but not all of them. So we attempted to do things on our own. Keep in mind, we work the exact same schedule, and it's the WORST possible schedule for accomplishing anything. 
We had to work on these small projects between our 3 night shifts with little sleep, little patience, little skills and lots of grumpiness. 

We didn't get it all done. So areas were drywalled, and yesterday was spent taking the drywall down in these areas... Ugh. Thankfully it's just the garage that we didn't get time to finish, but it still annoys the hell out of me that we didn't get it done. So now, we are going to have to buy new drywall, hang it ourselves, tape and mud it ourselves. After paying for professionals. But not before we add more support for the garage door brackets behind the drywalled areas. And hopefully we get this done before our garage doors arrive this week. Oh have I mentioned that our schedule this week is days Monday and Tuesday, Wednesday and Thursday we're off (but I have the girls so I can only be available between 9:30-3) and then we work Friday, Saturday and Sunday days followed by Monday and Tuesday nights. Right. Plenty of time. 

Have I also mentioned that my house has now sold and we need to be out of here by February 11th? So add packing/storing an entire house in that schedule too. $&@!#!!!!! If you see me, and I have no hair, it's because I pulled it all out. That could be true about my eyelashes too... They seem to be the first to go when I'm stressed. 

We are also painting our new house during this time. That should only take a few hours, right? It's about all I've got left, once I give up sleeping and eating for 3 weeks. Annnnnd I should probably move onto siding now, because I'm getting chest pain thinking about everything that has to happen with no time to do it in! 

Siding... It's up! Not all of it, but I'd say 1/3 of it. And I LOVE it!! 




We are using James Hardie fiber cement siding. The body of the house is called Iron Gray. I know what you're thinking, it should be called Iron Blue! I agree, but I love it all the same :)

The trim around the windows and doors is also James Hardie and it's called Cobblestone. I am so happy we went with it over a stark white. 

I have no idea when they plan on being finished with the siding. They're super nice (and funny) guys. But they don't move very quickly! It's also been bitter cold most days so I don't blame them. They've been at the soffits, fascia and siding for 2 weeks now... at this rate they should be done around May 2-4. ;)

I guess I should get off my butt and start packing... I've taken all the pictures off of my walls, but that's about it! Maybe I should get a job with the siding guys! My hours would be better... 



Jan 14, 2015

Clean Up in every aisle!

Our house is soooooo full of garbage!! 
We have not been diligent in cleaning things up as we go along. That's usually because the dump trailer always seems to be full and trapped in by 100 vehicles. 

And now it's actually frozen to the ground. So much for that!

Just a bit of garbage laying around...

So we got a dumpster to finish the job! Guess what we're doing this weekend? :)


There it is! Time to fill it! I took out a bunch of garbage from the main floor today and swept out the master bath and master bedroom. Only a few more rooms to go! Too bad you couldn't return Tim Hortons cups like you can return beer bottles... 

Now accepting applications for cleaners and painters. Will pay in baked goods! :)

Jan 13, 2015

It's almost time to decorate!!

Our goal when we first decided to move was to find space. Jake wanted space for a detached garage/workshop. I didn't want to move into a smaller house than what I'm in now. And I didn't want to move into a step down just for more grass either. I love my current house. I built it (with a builder) and I picked everything the way I wanted it. I made upgrades, and after 2.5 years, I wouldn't change a thing. Our neighbours are by far THE BEST. I can't even put it into words how great this neighborhood is. From day one, we've been included in beer pong nights, Halloween and New Years parties, Fires and BBQs. You need help with something? Or borrow a tool? Someone on this street would be willing to help you out in a heart beat, if not sooner! Our kids play together... And sometimes go missing at each other's houses (sorry!!).  They spoil us by letting the dog out in the middle of the night while we're at work. Where else can you get this?!  I moved into a town where I knew practically no one, and it became home. I've actually never felt more at home as I have here. I'm really going to miss it!!

Anyway... Where was I going with this post?! :)

When we started looking at houses way back when, I could imagine how I'd renovate and decorate it almost immediately after walking through the door. I was excited to decorate!!

With this house, I have spent so much time focusing on the bones, that I've spent very little time thinking about all the finishing touches!  Can you believe that I don't even know where to put my couch?! Eek! This is so not like me. 

We've narrowed down paint colours. We're using Benjamin Moore Chantilly Lace for all trim. It's the same colour as our kitchen perimeter cabinets. 


Our walls will be Benjamin Moore Barely There. It's an off white with a grayish tinge. That's right, every single wall in the house will be the same colour. Sounds boring... But just wait :)


We picked a fairly plain door and thanks to Houzz, I'm feeling adventurous and am painting them Benjamin Moore Raccoon Fur. 


Our doors are called Maddison by Jeldwen. They have a very plain, yet retro look to me. 


Wide awake on Sunday night at 2am (thanks to a snow plow!) I bought our first "decorations" for the house. 
Since our bedrooms are all going to have hardwood flooring I wanted to get some large area rugs. But 8x10 rugs are expensive!
I have an 8x10 rug in my house now that I bought online from Urban Outfitters and it was $200. I thought that was as cheap as I was ever going to find one so I went to that site again. I hit the jackpot!! I got 3 8x10 rugs for $212!! Amazing!

The girls rooms will be painted the same colour as every other room, but their ceiling is going to be painted Benjamin Moore Jamaican Aqua. 


Ta-da! Finally some excitement!
And they both got the same 8x10 rug. 

 
For $50!!! I wanted to wake Jake up I was so excited!!
I'm going to paint a couple of chandeliers a really bright turquoise as well and their beds will be painted either bright yellow or bright peach/pink. 

Tatum in her new room!

Rylan in hers!

The 3rd rug I bought is gold/burnt yellow. I haven't decided if it should go in the great room to add some colour with my black couch or in our room. 

$100!! If you need rugs, go now!! 

Our room will have a black iron bed... Eventually. It was a kijiji find and it's currently green!  And the inspiration for our room is a wool Hudson's Bay Pointe Blanket. 


Our bedrooms are almost taken care of... Now to get my mind working on the rest of the house!










Drywall!!

Things are really starting to heat up at the house! Almost literally!

We are fully insulated (inspections passed!) and almost entirely drywalled. 
These guys are efficient! They started insulating on Thursday, boarding on Friday and they'll be done boarding and starting taping on Wednesday. We're really impressed. 

We've been running 2 electric construction heaters to warm things up inside and they're working quite well. 
The basement was + 7°C yesterday! And today with the temperature feeling like -30° the basement only dropped by 2°C. 

From the kitchen, looking into dining area and great room. 

Master Bedroom

Shower in the ensuite... And someone sweet! 

We also got our water softener and hot water tank today. 


We decided to buy the hot water tank outright versus renting. It has an 8 year warranty and we would have paid for it in 3 years if we went with renting from Reliance. Seemed more economical to us!

Our garage door frames are up and our garage doors should be installed by next week! 


We are really happy with how everything is turning out. It's hard to believe that we're getting to the end! Sort of :)







Jan 10, 2015

Ugh. Inspections.

This blog post is kind of all over the map... Just a warning! :)

As a condition of a building permit, you must have your house inspected after certain stages of construction. 

We were smooth sailing in the beginning. Foundation, septic, plumbing rough-ins all passed without a single issue on the first try. 

Then onto framing. We've been struggling to get our framing passed since December 3rd. I think we've had 4  or 5 framing inspections so far. And every time they find something new that needs to be changed or fixed. A couple of "deficiencies" the inspector noted were complete misunderstandings, or complete idiocy if you ask me. 


Not to mention, his penmanship is atrocious. 

Our poor framer has been back to fix these deficiencies over and over and just when you think we're sure to pass, we walk into one of these slapped on a wall!


What does this even mean?!  What list?!
So after countless phone calls and emails  to the inspector, we finally figured out what this nonsense was about. He somehow didn't notice that his previous list of deficiencies from December 3rd had been fixed? Bah!

We still have 2 more deficiencies that Jake and I will be attempting to fix oursves between nights this weekend. This house has more "bracing" and "blocking" than any other house, I swear. Our framer actually agrees!

Building a house seems to be 1000 chicken before the egg scenarios. What goes first?! Well, it depends who you ask!
Thankfully, the building inspector has agreed to let us continue insulating, vapourbarriering (new word) and drywalling the areas that don't have framing deficiencies. Yay!




It's starting to warm up in there! Too bad the deficiencies Jake and I are working on are outside in the -20°C weather. 

So... Where are we at with the house now?

- plumbing and electrical inspections - complete!! First try :)
- most batt insulation is in (main floor)
- most vapour barrier is up (main floor)

We got the insulation and vapour barrier on the main floor inspected before moving on to drywall on Friday... FAIL!!

How can you fail an insulation and vapour barrier inspection? Well, our walls are insulated with R22. Our Energy Effiency Design Summary (that was submitted with our plans in order to get the building permit) says that our walls will be insulated with R24. You've got to be kidding me!!!? Thankfully the guys we hired to do this know a thing or two about insulation!
Our blueprints state that the insulation will be R21, but we also have 1" rigid foam insulation on the exterior which has an R5 value. Ta-da! So we actually have a total of R27! More than our original plan. Take that building inspector! Shouldn't he know this?
Now to get him to answer his phone... And to come out and take down his annoying orange sticky notes.

So Monday afternoon we'll get our dear old friend the building inspector out again to (hopefully) sign off on the 2 remaining framing deficiencies and to clear up the insulation misunderstanding. After that we can have insulation blown into the attic and finish drywalling.  
 


There's just one more 'chicken before the egg' situation we need to deal with.  In order to keep the insulation being blown into the attic in place, the soffits need to be on the house. We currently have the front and 2 sides done. So the soffit guys (official job title I'm sure) need to finish the back by Tuesday morning at the very latest.  I know it's been freezing out this week, but these guys have been only putting in a 3 hour work day... Frustrating!!!

The soffit guys have also told us that we need to have the back timber frame up on the porch before they can finish the soffit. And the timber frame guy is on vacation in Mexico for a week. Oh boy. 
We've decided to go ahead with the soffits at the back of the house, and have the timbers work around them after. We NEED to keep going on this house. No delays!


Here's how it's looking now! 3/4 of trim and soffits up!

I am impatiently waiting too see how the siding looks!! Hopefully soon!



Dec 30, 2014

Reclaimed wood, claimed kitten.

We've known what we wanted for hardwood flooring forever, we just didn't know how we were going to get it in our budget! 


What we wanted:
- wide planks
- reclaimed
- lots of colour variation/patina
- affordable

What we're getting:
- wide planks but varying widths
- 100+ year old hemlock reclaimed from Southern Ontario barns
- lots of colour/variation
- affordable!
- 1 free kitten


Meet Samantha, our newest family member. Named by the girls, in case it wasn't obvious!

We are quite pleased with ourselves for finding the exact flooring we wanted, and within budget. Even if it means now having a cat! 

There are a ton of reclaimed hardwood flooring options out there. But you're paying at least $10-15/square foot, plus install, plus finishing. When you're putting hardwood throughout almost your ENTIRE house, that's steep!

Once I realized the cost of reclaimed floors, I started looking for barns being demolish or barns that are on the verge of falling over to source the wood myself. I was willing to do whatever I had to do to get them. Thankfully we came across a man who demolishes barns and sells the lumber at a reasonable cost. Waaaay easier than tearing down someone's barn and carting it home in the Jetta! 


Once he gathers enough barn boards in decent condition, he'll take them to a mill to be denailed and planed flat and to equal thickness. After that they get sent to another man to be kiln dried and tongue and grooved, turning it into flooring. 
Kiln drying removes excess moisture, and BUGS!!

We will have our own installer install the floor at this point. Because the planks will be wide, they'll need to be glued and nailed down. Some planks will be over 10" wide and they could have a tendency to cup with humidity, which is the reason for using both nails and glue. 

When it first goes down it will still be fairly rough looking. We want a rustic look, but we also want the age and patina to be visible. We'll be hiring someone to do a very light sanding and finishing. We don't want to stain the floor because we like the natural look of aged lumber so we're going to go for an oil finish. 

It is kind of risky picking flooring without actually being able to see what the finish product will be... But it's worth the risk if you ask me!

I'll be sure to keep you posted on the many steps it's going take to get the perfect floor!  I'm hoping to be able to see our cabinets in production sometime in the next couple of weeks too.
I love seeing how everything is made!