May 17, 2016

Oh boy... Here we go again!!!

Well... Remember in my last post I had mentioned we wanted to be 100% finished this house by mid-May? There's a perfectly good reason for that... We're doing it all over again!
That's right, we're building another house.
Are we crazy?! I think so!

We love this house. We love Lucan. We love our property. But we don't love the distance between the girls' school and home. So we want to move closer. Right now we're about 25 minutes door-to-door. The drive to and from school isn't bad. The issue is when the girls have activities after school, but not until 5:30 or 6:00pm. We don't have time to come home in between and we end up just killing time in the car... for hours! And I don't know how we'd even deal with the distance when one is in high school and the other one is still in elementary school with two different start times. We hadn't really thought all of this through unfortunately. 

So after LOTS of thought and lots of tears, we've decided to sell our pride and joy. 
The first few weeks after our decision didn't feel real, but now that we've posted our house for sale on Facebook and people are coming through it, it has started to sink in. I know we're making the smartest decision for our family, but it's going to be really hard to leave this place. I thought of every square inch of this house in great detail and spent so much time and energy on planning our perfect home. 
I'm sure the next family that moves in here will enjoy everything there is to offer, so that makes it sting a little less. 

When I start feeling sad about selling our house, I try to think ahead of yet another amazing country property. Except this one is way closer to school!

 
 
Here we are... nervous and excited smiles!

I'll fill you in on more, once we know more! We're still working on floor plans and site plans and we're actually excited to do this all over again!

Nov 21, 2014

Boom Shakalaka

Finally, after days of waiting for the weather to improve, the boom truck arrived to put up our roof trusses! 





It was too windy for a good 3-4 days so it put us behind schedule. 

Thankfully there was still lots for the framers to do. Like frame the basement walls including our laundry room downstairs. We'll have laundry rough-ins on the main floor for when we're old. But for now I'd like more space in the mudroom and I figure I can manage stairs for a few more years :)



The sun is shining now and my fingers are crossed that plywood will be making its way onto the roof today. Next week is supposed to be milder, so it would be ideal for shingling!  

The timbers for our back porch were delivered yesterday. They look so big and strong! 


They are 8x8 pine timber posts which we'll stain to match the cedar on the front of the house in the spring. 

With this crappy start to winter, we're really putting the pressure on to get everything closed up. Our windows are being delivered on Monday... Exciting!!

How our house looked at 7:30am today!



Nov 6, 2014

It's Framing Men, Hallelujah!

We are moving along right on schedule. Well, our newest schedule. 

Framing started on Monday and is moving pretty quickly!
It will be really nice to see walls instead of having to imagine them. 

Jake and I had mandatory training on Monday, so we weren't around on day 1. It made me a little nervous, but my dad was available if anything went wrong. 
Thankfully everything seemed to go fairly smoothly... We're also thankful that our house is down the road from where we ordered all of our building material because a few things were forgotten. Like nails. Who needs nails to frame a house?!

Knowing we couldn't be there we had arranged for the supplies for day 1 to be delivered on the Friday before and our framer had the most current set of floor plans and the rough opening dimensions for the windows before starting. 

We rushed out to the house after our training day to see the progress, it was getting a little dark, but this was day 1 of framing:

Picture of the back of the house

The back wall was framed. The windows look huge now, I love them!

The load bearing wall next to the stairs was also up because it was needed for the steel beam to be installed the following day. 

As we were leaving the house on Monday night we got a call from our framer. He had noticed that 6 floor trusses weren't made long enough to account for the fireplace sticking out of the back wall. 
Just a small oversight by the truss company, but they fixed it right away. 

This is the plan for the floor trusses that they sent trusses for. Notice the back wall is completely flat?


There should be a few longer trusses to support the fire place, like this:


The trusses were dropped off the next day and all is good!

The steel beams and floor trusses were installed Tuesday/Wednesday:


The subfloor is going down now, glued and screwed to prevent movement and squeaky floors. 


The garage walls are also framed, ready to go up


And even a bit of sheeting is on the back of the house. 


Today we dropped off the saddles for the deck posts and the post should be arriving this afternoon or tomorrow. I can't tell you how excited I am that it's finally looking like a house, and that the weather has been cooperating for the most part. I just want the windows in and the roof on before our first snow storm! November, in Canada... This isn't too much to ask for is it? 









Oct 15, 2014

A Day of Disappointment

Tuesday was supposed to be a really fun day in the house building world. Our plumber had set up an appointment for us to pick out all of our fixtures from a business in South London. The appointment was set up the week before so I (im)patiently waited for the long weekend to be over so we could finally go. I couldn't wait!  
All weekend I had pictured a GIANT showroom with every possible faucet, tub, sink and toilet you could imagine!

My expectations were a little high, as they usually are. So I did anticipate a bit of disappointment... 

We walked in to the showroom and were promptly ignored by 2 sales people. I must have been wearing my invisible coat again. After a few minutes of touching everything in sight we managed to get the attention of one of them. 

Now on to our appointment...
1) there wasn't a ton of selection. I wanted bathroom faucets that were a little retro looking. Nothing country, nothing super contemporary, just something classic and timeless like these: 


They didn't have that style in an affordable option... They only carry "premium products". And that brings us to # 2) Not so friendly staff who made assumptions about our budget (albeit she was right). But how did she know that I wasnt extremely passionate about top of the line toilets and willing to splurge?! 

Multiple times we were told that we "didn't want that" when we actually did... 

Square kitchen sink, "you don't want that. You won't be able to clean the corners." 

"That's really expensive. Like 3 times more than the ones you were looking at."

Our choice of freestanding tub, "don't buy your tub from there. They're not CSA approved and you'll fail your inspections."

She ended up being right about the tub, but her choice of words were quite poor and I wouldn't be grumpy and writing about my crappy day if she had just been a little nicer and a little less 'better' than us.

I know our floor plan didn't load clearly for some people earlier. If you were one of those people then I'm going to assume that you didn't get a good look at our ensuite floor plan. 


See that tub? We found the perfect tub and faucet combination for around $1000 somewhere else. We actually designed the bathroom around that tub. You know, the not-CSA-approved-fail-your-inspections tub. Crap. 

Since Jake nor I are really big bath people, we couldn't justify spending the extra $3-4,000 to get a different CSA approved tub that we liked. We'd rather spend that money elsewhere. So we made our first major change today. We said good-bye to the freestanding tub, shrunk the window width by 1/2, moved the toilet in front of the window and made our 1 big vanity into 2 separate his & hers vanities. 

Professional sketch artist for hire.

We're actually both pretty pumped about having our own vanities. No more looking at someone else's old toothpaste crusted to the side of the sink! Yay! Maybe not such a bad day after all.

Except that it doesn't end there. We decided to cheer ourselves up after the horrible service at our 1st appointment by going counter top shopping...

I love the look of Carrara Marble... Don't worry, we weren't crazy enough to price marble. But they do make some pretty good Carrara Marble look-a-likes in quartz!  

This is LG Viatera in Minuet. My top pick. 
It's beautiful. But it's also $6,000 just for the kitchen perimeter. 

Regrettably, we have decided to pass on quartz  for now and go with a laminate top with a Marbella edge. 

Laminate: Wilsonart Carrara Marble
(I have this in my kitchen now and I still love it)

Marbella squared edge profile

As much as we'd love quartz counter tops, we are trying to stay on budget. We have made some splurges on bigger things that can't easily be upgraded later like the stone exterior all the way around and using open web floor trusses as opposed to I-joists. More on those later. 

One exciting thing that happened was picking up our 'saddles' for the posts/beams for our porch and deck. These will be mounted to sonotubes filled with cement and then beams will be attached to them. 

9 heavy duty beam saddles taking up real estate in our garage. Along with some mudroom tile. 

I have no idea why these things made me so happy, but they did!  I think it could have to do with my obsession with timbers. The timbers we're using are true 8x8s so we needed to have the saddles made custom. 

I cannot wait to get to the framing stage to be able to walk through and see what this place will look like 3D!






Oct 12, 2014

Started from the bottom now we're here!

Hey!  Thanks for stopping in!  Jake and I decided to keep a blog/journal of our self-contracting adventure.  When we were researching building our own house, we found that there was a lack of real information from people who have done it... so hopefully this will help someone else in the future!  And if not, it will be a good spot to keep a record of what we've done and how we went about doing it.  Although I'm sure there will be things we'd rather forget!

Since our house building is technically 3 days in at this point, I'll give you the Cole's Notes version on how we got to this point, and then hopefully we'll be able to keep up as we move along.

March 2014 - We purchased our building lot. Yay! Just over an acre, 2.5km from the town of Lucan, Ontario.


April 2014- Our lot closed on April 25th and it was officially ours!  We had started looking at floor plans in March but knew we wouldn't be starting to build until Jake's house had sold and closed.

May 2014 - Jake sold his house!  Now to start pricing plans!  We found a floor plan we liked on the Beaver Homes and Cottages website, and made some modifications with our house designer to spruce up the exterior.  By the time we had finished "sprucing up" the floor plan, we had a 2400 square foot bungalow... which we were told was a "large" bungalow.  On paper, it looked fantastic!  Until we found out how much paper it was going to cost.  Back to square one!
July 31 2014 - Jake's house closed!  And we had picked out a new, smaller floor plan to work with!
But eventually over time, it too grew from about 1900 square feet to 2050 square feet. We tried!

My dad suggested taking our plans to builders for quotes so we had an idea on budget, so we did. 

The majority of builders in our area charge $160-175 per square foot. We disagree with this method of pricing a house, but a lot of builders go that route. Our thought is that every house no matter how big or small still has 1 kitchen, 1 furnace, 2 or 3 bathrooms... So why does adding 500 square feet, of let's say a living room, equate $85,000? It shouldn't. 

Anyway, moving on! After speaking to a few builders, we decided our best option was to contract the house ourselves to save a bit of money, which brings us here! My dad has done this a few times, so we knew we'd have him to help guide us along. 

September 2014 - We did a lot of waiting. Waiting on engineers to stamp drawings, waiting on roof truss designs, waiting for trades to get back to us with quotes and availability and then waiting on our house designer to modify the plans after the engineers had a look at everything. 

We ran into a few snags, but all in all it went pretty smoothly. 

September 19th, 2014 - We finally had everything we needed to apply for our building permit. We need a septic system as well, so we applied for this permit at the same time. According to the Ontario Building Code, the municipality has 10 days to respond to your permit application. Lucan Biddulph used all 10 days... And even a couple of extras before we could physically pick up the permit. They did tell us everything was fine and they were issuing a permit on day 10. If you're as impatient as we are, don't be afraid to call them and ask for status checks on your application. Squeaky wheel gets the grease! 



Finally, we had the permits in our hands! Now to begin the physical work of building a house...